top of page

Quick update and videos are up!


We've been busy, and as many of you know that means things don't get posted right away. Time for a quick update.

The gear area has been siliconed and sprayed. Vents, the windows, and the mounting points for the solar panels have all been siliconed and sealed where necessary. The second battery bank is now installed and hooked into the system, making it a 436Ah 12v system. The rotary cam switch is installed and functions properly for power selection between a 1500w inverter and shore power.

Next on the list is to tackle the microwave reinstallation and the walls.

We did say quick, right?

We've also updated our YouTube channel with the first few videos. Bear with us as we learn to vlog, or at least post some interesting videos! The channel can be found here for Parachuting Beaver on YouTube.

The latest video is of the rotary switch instillation. We realize it doesn't totally cover how the system works, and will likely be covered again in a future post.

The other videos contain a walk through, spraying the gear area, and how much wall paper removal stinks on a Friday night.

Many of the videos are test runs, and samples of work being done. There will be more coming to outline the solar panel setup, additional changes, and how the storage is going to be setup.

Oh and of course...the lovely train makes an appearance.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page